Big Picture: Where are we? Inside, Doors arrived, so we are focusing on getting them installed. The team is also working to complete the sanding the stairs Outside, Still cold. Corp Update We hired a second employee effective Feb 1st. More hands, so hopefully this helps speed up some of the work on the stairs andContinue reading “Status Report, 14 Feb 2022”
Tag Archives: stairs
Status Report, 31 Jan 2022
Big Picture: Where are we? Inside, Progressing on trim work. Painting is on ‘pause’ until we get some more trim up. Tilework is also paused. Outside, Less snow shoveling this week vs last week. Goals for Week of 24 Jan Complete tile work on second floor guest bathroom. {incomplete – see below} Complete stairwells –Continue reading “Status Report, 31 Jan 2022”
Cable Railing Completed
At Pearl St, the attic is a usable bedroom, and we wanted to dress it up a bit, so I opted to fabricate and install a cable railing system. For some context, we closed in 3 sides of a stairwell opening, for a total of about 15 linear feet. Here’s a cost breakdown for theContinue reading “Cable Railing Completed”
Status Report, 18 April 2021
Goals for week of April 11 As much as I can on 3rd floor railings (no progress) Head to California to pack out! (done) Sign a tenant for 580 Orange Ave. (done) Accomplishments Tenant has been selected for Orange Ave. We had a number of highly qualified applicants, and choosing the right fit was notContinue reading “Status Report, 18 April 2021”
Status Report, 11 April 2021
Goals from week of Mar 22 Finalize move date from California Install railings on 3rd floor Accomplishments Move date is locked. Packing will be April 21, and truck leaves April 22. We’ll be moving a small load to Pearl St. right away. The remainder of the Los Altos house will be in storage in CAContinue reading “Status Report, 11 April 2021”
Status Report, 4 April 2021
Goals from week of Mar 22 Framing start at Mintwood. Pearl St. railing on 3rd floor Continue to source roofing bids for Mintwood. Meet with mom to finalize the reconciliation entries in the books. Accomplishments Framing underway. Basement stairs and powder room platform complete. Footing poured for post in basement Reconciliation of books underway. Corp UpdateContinue reading “Status Report, 4 April 2021”