Big Picture: Where are we? Inside, Trim work on third floor is complete until the doors arrive. Tile work underway in second bathroom. Sanding of stairs coming along nicely. Outside, Lots of snow this week- 12″ on the 17th, and another 4″ on the 23rd. Goals for Week of 17 Jan Complete trim work onContinue reading “Status Report, 24 Jan 2022”
Author Archives: Entropy Properties LLC
Status Report, 17 Jan 2022
Big Picture: Where are we? Inside, Began tile work on second floor guest bath and also began trim work on the third floor. Outside, it’s too cold to do much other than keep it clean. Goals for Week of 10 Jan Start trim work on third floor. Should be able to complete everything that doesn’tContinue reading “Status Report, 17 Jan 2022”
Status Report, 10 Jan 2022
Big Picture: Where are we? Inside, Tile work on third floor is complete! Trim painting is underway, and we’ll start installing that next. Outside, it’s too cold to do much other than keep it clean. Goals for Week of 3 Jan Complete all tile work on third floor. Start and finish the floor, and groutContinue reading “Status Report, 10 Jan 2022”
Status Report, 03 Jan 2022
Big Picture: Where are we? Inside, We continue to work out of sequence, but progress is good. Third floor painting is complete, and tile made significant advancement. Master bath progressing also. Outside, it’s too cold to do much other than keep it clean. Goals for Week of 27 Dec Complete all tile work on thirdContinue reading “Status Report, 03 Jan 2022”
Status Report, 27 Dec 2021
Big Picture: Where are we? Inside, Focus has been on third floor tile. We also managed to get marble for the master bathroom window sill and jambs. Outside, it’s too cold to do much other than keep it clean. Goals for Week of 20 Dec Progress on master bath. A “good” outcome would be mostContinue reading “Status Report, 27 Dec 2021”
Status Report, 20 Dec 2021
Big Picture: Where are we? Inside, Kitchen cabinet install continued, but delayed on damaged materials. Electrical work continues – found an issue there also. Painting continues as well.Outside, it’s too cold to do much other than keep it clean. Goals for Week of 6 Dec arrange materials on 1st floor to maximize usable space {completed}Continue reading “Status Report, 20 Dec 2021”
Status Report, 13 Dec 2021
Big Picture: Where are we? Inside, Started kitchen cabinet install. Grouted floor in master bath and preparing for tile. Painting started on 3rd floor. Outside, it’s too cold to do much other than keep it clean. Goals for Week of 6 Dec Install upper cabinets in kitchen {40% complete} Get started on tile work onContinue reading “Status Report, 13 Dec 2021”
Status Report, 6 Dec 2021
Big Picture: Where are we? Inside, All plaster & drywall work is complete. Master bath floor tile is installed and ready for grout. Getting bids for paint. Outside, it’s too cold to do much other than keep it clean. Goals for Week of 22 Nov Finish all drywall/plaster work. {complete} Get started on tile workContinue reading “Status Report, 6 Dec 2021”
Status Report, 22 Nov 2021
Big Picture: Where are we? Inside, Plaster/drywall finishing work on 2nd and 3rd floors is complete. First floor only has the staircase remaining. Tile is down in master bathroom Outside, it’s too cold to do much other than keep it clean. Goals from Week of Nov 15 Finish all drywall/plaster work. {98% complete} Install theContinue reading “Status Report, 22 Nov 2021”
Status Report, 15 Nov 2021
Big Picture: Where are we? Inside, Plaster/drywall finishing work on 2nd and 3rd floors is complete. They just have the 1st floor remaining. We’ve started priming the walls. Furnace on 3rd floor is installed, but not connected yet. Outside, Just lots of cleanup outside. Back yard is tidy, and so is the front. Goals fromContinue reading “Status Report, 15 Nov 2021”