Big Picture: Where are we? Inside, Started kitchen cabinet install. Grouted floor in master bath and preparing for tile. Painting started on 3rd floor. Outside, it’s too cold to do much other than keep it clean. Goals for Week of 6 Dec Install upper cabinets in kitchen {40% complete} Get started on tile work onContinue reading “Status Report, 13 Dec 2021”
Tag Archives: tile
Status Report, 6 Dec 2021
Big Picture: Where are we? Inside, All plaster & drywall work is complete. Master bath floor tile is installed and ready for grout. Getting bids for paint. Outside, it’s too cold to do much other than keep it clean. Goals for Week of 22 Nov Finish all drywall/plaster work. {complete} Get started on tile workContinue reading “Status Report, 6 Dec 2021”
Status Report, 22 Nov 2021
Big Picture: Where are we? Inside, Plaster/drywall finishing work on 2nd and 3rd floors is complete. First floor only has the staircase remaining. Tile is down in master bathroom Outside, it’s too cold to do much other than keep it clean. Goals from Week of Nov 15 Finish all drywall/plaster work. {98% complete} Install theContinue reading “Status Report, 22 Nov 2021”
Status Report, 15 Nov 2021
Big Picture: Where are we? Inside, Plaster/drywall finishing work on 2nd and 3rd floors is complete. They just have the 1st floor remaining. We’ve started priming the walls. Furnace on 3rd floor is installed, but not connected yet. Outside, Just lots of cleanup outside. Back yard is tidy, and so is the front. Goals fromContinue reading “Status Report, 15 Nov 2021”
Sharpen the Saw (Training)
Back in my corporate life, one of the things I never did enough of was training. This was particularly ironic given the high value I assign to education. It’s important enough that I sat on the board of an industry education group (training people on the current state of the payments industry) and I alsoContinue reading “Sharpen the Saw (Training)”